Friday, November 7, 2014

Various and Sundry Items of Interest, and ... The Shower Pan!!!


It has become obvious to me that I have entered a new era in the housebuilding process.  With the exterior construction more or less nearing completion, and various next steps awaiting attention, a lot of juggling and some serious prioritizing has become the norm.  All of a sudden there seem to be a million details all at the top of the list: wiring and electrical fixtures and devices, both 120V and 12V, heating system decisions, wall coverings, fastener types, vent fans (solar, 120V and 12V!), trailer lighting fixture replacement, shed design and hardware decisions, loft ladder construction, floor sealing, et cetera, et cetera.





Additionally I have of course been getting antsy to install interior cupboards, the windowseat/bed unit, and re-purpose and up-cycle many of my collected possessions into useful parts of my tiny house.  Most of these re-construction projects first involve heavy lifting somehow, so I am stymied immediately on initiating these thrilling projects.  But, lo and behold, thankfully a friend actually expressed interest in the futon mattress that had been on this frame for years, as my couch.  So I rolled it up and tied it into a big slug-like floppy roll. And she and her son came over a few days later and took it away!!  The next step is to disassemble the frame and get it moved to the tiny house so I can start modifying it into the folding windowseat bed. 




Another topic which naturally deserves top priority attention too is the acquisition (or not?) of a tow vehicle.  B's Suburban turns out to have a tow bar mounted on the frame and not the bumper (who knew?) and thereby is capable of towing more than was mentioned in the specs I glanced at after I first saw it. It could easily tow my house!  That certainly caught my attention.  A Suburban would probably be a great choice as it is like a station wagon version of a truck.  My budget cannot handle the purchase (or probably insuring) a new vehicle, so I am keeping one eye open for likely prospects, keeping in mind that what I want is an old (i.e. inexpensive) but faithful (i.e. reliable for a few years) truck/vehicle capable of towing 10,000 lbs.  I have learned in the course of my ingenuous conversation with a number of folks, with whom I probably would otherwise not have had anything to talk about, that I want a 3/4 ton pickup, with a heavy towing package.  This includes a special radiator. Also a trailer brake set-up, so as to have the trailer brakes do their duty of slowing the trailer at the same time as, or just a little ahead of, the truck.  Do I want diesel?  Or do I not want diesel?  Or do I just want to hire people who own such trucks to tow the house anytime I move it? Research is ongoing behind the scenes.  But as with every aspect of this process, there is a lot of advice available, in person and online, some of it conflicting, but no way to know exactly when I have done enough research and can make a choice.  That is the bad news, and the good news -- there is so much to learn!



For a temporary entry door, I bought an inexpensive interior hollow core door, coated one side of it with three coats of exterior latex paint. Then I got the brilliant idea of making it a Dutch door! I marked it, had it cut in two, and pulled out the cardboard supports, replacing them with XPS rigid foam insulation and a reflective layer of bubblewrap insulation. It is going to be a good test to see if a Dutch door is right for me, before we start messing with the circa 1782 door from the house I grew up in.  I clearly remember loving the Dutch door on my childhood playhouse, but am willing to entertain the possibility that my tastes have changed in the last 50 years. I will find out!   However if this door gets me through the winter and a trip to my dear friend in B-----, MA., that will suffice. I have my doubts about it lasting through too many wet rainy days, but will report. 




A view of the house at night, as construction lights on two long extension cords from Big D's studio give it a homey feeling when seen from the outside.




Okay, here is the news you've been waiting for!  M, having completed the hammered copper shower pan, spreads some M-1 adhesive (from the steel company where we got the copper and the roofing material), preparatory to inserting the pan into the sturdy wooden frame.



And...it is in!!  M has piled various anvils and bags of concrete into the pan to make an excellent seal, and clamped everything that could be clamped.  Then she waited, a day, two days, perhaps even three -- and... 



Oops!  This is actually a photo of the shower pan before it was adhered to the frame!  Drat!  Well it looked just like this from this angle after it was attached.



The scene shifts to evening in the tiny house, as Kyle and M install the shower pan.  Kyle drilled a 3" hole, through the floor, the insulation layer, and the steel trailer bottom for a drain pipe that will gather grey water into a holding tank and discharge system.



They test the drain, and decide that gasket under the brass fitting is too stiff and too thick, and therefore interferes with the seal, allowing water to sneak between the gasket and the copper.  Replacement with a squishier, thinner gasket is pending. 




The shower pan is, however, installed!  And insulation in the empty bays (with XPS, not polyiso) and walling the shower stall with Wedi material can proceed.  Under the curb of the entry corner of the shower may be seen a gap.  This is to allow access to the washer/nut which must be loosened if ever the shower pan would be removed.  It will also be a bit of storage space under the shower stall, perhaps for the wrench that would be needed to loosen the washer/nut!




This photograph has a warmer tone to it, and the copper looks more as it really does.  It is a beautiful piece of art work, a sculpture really.  And it will be a joy to have in my line of sight. It will surely assist me in tasks of everyday living, such as washing clothes and dishes, and rinsing paintbrushes and clay tools out, in addition to being a simple shower.  Thank you!

5/16" Luan Plywood Subbing for Drywall





After many (many!) brainstorming sessions to come up with something to use as a wallcovering instead of drywall, which is way too heavy, I finally settled on this thin luan plywood.  Not particularly environmentally correct in any way, the choice of luan came down to weight, expense, and ease of installation.  This is a thickness usually used for underlayment, and it has considerable flexibility, and I only hope that it doesn't droop or sag too soon.  I plan to do a sort of board and batten look eventually, covering the seams and lines of nails with strips pf lath, and, when painted, I hope it will look simple and clean, not cheap and crappy....



Kyle and B set up a cutting station right outside the house, since no rain was forecast, and after that the installation went very quickly.  



Here they are putting up the loft ceiling sheets. It was handy for them to work as a duo at this point, although either of them could have managed it alone.  Using a lot of measurement, and a lot of compressor nail gun work, they fastened the luan up with 3/4" finishing nails or tacks.   The ceiling was up in an afternoon that stretched to sunset.



To B's right may be seen wallcovering on the loft dormer cheek walls.  It was grand seeing that fiberglass-covered polyiso getting covered up so quickly. No moisture barrier was used on the ceiling, but plastic sheeting was installed on the walls as the work moved down to the first floor.


   
Work continued until dark and beyond some days, and the weather was very benign, giving us day after day of delicious Indian summer.



Enter M, a recent sculpture and new media graduate, whose name was given to me by the department technician, and who brought cheerful steadiness to his labor. He was very amiable about getting pulled into the time-crunch of the last week before the housewarming party.  We wanted to get as much completed as we could, since a week after the party the house would be towed to a new location.  Both Big D and B were incredibly gracious and generous about allowing the use of their equipment, and putting a well-deserved trust in Kyle's good treatment of it.



When the time came to start cutting holes in the luan for electrical boxes, I got an electric roto-zip tool, having used one on drywall in the past (as assistant instructor for a woman's home repair class program).  It was a good tool to have even if it did have a mind of its own at times. Kyle's proficiency increased as he and the tool came to a better understanding.



This view shows the aft wall, which was covered entirely with luan, since the windowseat will be built in and would cover any wainscoting.  On the far right in the photograph may be seen the unfinished area below the future chair rail; this will be covered with tongue and groove pine wainscoting or bead board.



Looking forward up into the loft, it may be seen that almost all paneling is in.  Kyle spent some careful time working around the windows, so as to use as few small pieces of paneling as possible; he cut out rectangular holes from large pieces for the window openings.  The unfinished triangular area in the bow wall will have two small triangles covering the insulation, and eventually in the center two openings will be cut out, to allow access to the upper part of the shed from inside.  On the outside of the house, this area of the shed will be difficult to reach anyway, and it will be handy to have a cubby up in the loft.  A final note on the luan:  obviously it looks different in different lights, and often looks rather pink.  I plan on painting it, or at least staining it, to tone down the pink, even though the actual grain pattern is very pleasing.

Thursday, October 30, 2014

Polyiso(cyanurate) Post: B&B Insulation Installation





On the first day of installation of the polyisocyanurate rigid foam insulation, we were all reminding each other to make sure the roof membrane in the peak of the ceiling got sliced out (before the foam was installed!); otherwise all the meticulous attention to detail on Kyle's part for the roof venting system would be wasted. This was successfully accomplished in the loft peak, where the ridge cap had already been installed.  Ultimately Kyle sliced out the portion in the peak of the great room from up on the roof, as he was installing that final ridge cap.  This is B's helper, B, working up in the loft.



Here the polyiso blocks are being installed in the ceiling of the great room, the "cathedral ceiling".  It turned out that no adhesive was needed, because B&B were able to cut the foam precisely enough that it could be friction-fit really securely.  The two worst parts of the job were 1) the tiny fiberglass fibers which were mostly quite loosely attached to the dark facing paper, and brushed off easily onto clothing or skin ("the gift that keeps on giving," as B said), and 2) the peskiness of insulating around the electric boxes and wiring with spray foam, which comes in various expansion strengths (confusingly labeled), just to keep us guessing when we went to pick up supplies. Generally we wanted the spray foam with the smallest expansion rate, so as to more easily control the application around the wiring.



So the first day a lot was accomplished, by avoiding the spaces which had electrical boxes in them.  The Xs below the level of the future chair rail in this view are reminders not to insulate before the installation of the shower pan, due to the carpentry installation process. The oil-filled electric radiator in the foreground was needed on a few unseasonably cold and gusty days, and was powered by an extension cord (two actually) from inside Big D's basement studio.

 

Then came the little chunks to be pushed into the spaces between to joists of both loft spaces; then triangles and other geometrical configurations, here seen in the bow wall of the sleeping loft.




Lastly on the insulation (except for the shower pan wall spaces), B and M (a new helper, a recent college graduate in sculpture and new media), and ultimately Kyle, had the fun of spraying foam into crevices and around electrical boxes. Some of the foam tended to get a little out of control, which necessitated shaving it off. Or in some cases the spray foam began lifting out the block of polyiso, which later necessitated shaving that off.  The loan of an awesome flexible Japanese hand saw by B (who generously loaned a number of pieces of equipment and tools -- thanks so much!) made the insulation shaving go much more smoothly than it otherwise would have.  So other than tossing more fiberglass fibers into the air and into cracks and all over the floor (fiberglass makes Laurie cranky, can you tell?) the insulation installation was a huge success!



The source of some crankiness, in the interest of having a really toasty home in cold weather...



Somewhat tidier but not yet fiber-free!! Where is the shop-vac? This post has a cliff-hanger ending....!!!


Friday, October 24, 2014

Exterior 120V Outlets and Interior 12V Wiring




Kyle and electrician P converse about the construction portion of the installation of two exterior outlets on the house.  One will be at the stern, looking ahead to a possible use on a porch, and the other is for the entryway light just outside the door, on the starboard side.   It was decided to wire the entryway light connection as an outlet, and not hard wire the fixture.  It was thought prudent to plan to remove the light fixture before barreling down the highway (creating 60 mph hurricane force winds) without having to worry about it being sheared off by the force of the wind.  (Note Kyle's nifty styrofoam pads on the extension ladder in the background -- added in order to rest the ladder against the roofing without any nicks or scrapes or dings.  




Here Kyle is installing the wiring box by the door, having custom-made a nifty reversed cedar siding frame for it that will hold the screws for the receptacle and lid.  




And this is what the stern outlet looks like on the inside of the house, blocking having been added to secure the position of the box.  It is the blue box you can see behind the short 2x4.  The grey box is for an interior receptacle below the window seat.  Eventually this small area will be filled with spray foam.


 

The finished stern exterior outlet with its cover, a nice bronze instead of the usual white or grey. 




P rigged an instant roller for the 12V wire, with Big D's crowbar, Kyle's ladder, and a coat hanger from my trunk. It works perfectly.  She gets the two lengths of 14-3 tinned copper stranded marine cable up in the peak of the ceiling in no time.  


 

In mid-wire-pulling, I decide we need to re-route the 120V and the 12V cables to avoid the openings to the future cubby (the peak of the shed out on the tongue, which will be accessible from the loft, not the shed).  What you see is the re-routed cables going down the starboard gable line of the bow wall.  The cubby openings will be on either side of the two (tallest) center bays between the bow studs.  P generously humored my change, and it was done by the end of the hour.




A piece of nifty scaffolding equipment of B's (shaped when folded up a bit like the letter "W") creates this gangway going from one loft to the other, allowing P to tie up the 12V cable with the 120V pipe and prepare the junction box for the chandelier fixture.   




A view of the stern storage loft mid-wire-pulling.  Note the 12V and 120V systems are two completely separate systems, and there is no inverter involved.  The 12V will only be powered by the deep-cycle marine batteries and the 120V powered by household current from a friend's garage, or an RV hook-up.




Sketching for the positions of the marine 12V double receptacles. This is in the stern wall to starboard of the big window. The outlet will be accessible in the sidewall of the starboard bookcase in the windowseat nook. Probably for a USB charger! 




We almost had enough 12V cable on the 100 ft. spool from the marine store, but ended up buying about 20 feet from a big box building supply store.  It was stranded copper OS cable, 14-3, and worked fine.




Not to be forgotten at the tail end of the post is the taillight re-installation.  Kyle removed these after the first towing journey for their protection during the heavy exterior construction phase.  Now they will be replaced for good, ready for the next move!

The Roof Finale


Kyle is in the home stretch of the roofing installation here.  The ridge cap goes on last, after cutting the roof wrap that was over the venting, and installing the perforated venting strip, and the Z trim.  Lots of caulk and adhesive and rivets.  All the screws are concealed.  It turns out the dormer ridge cap line is lower than the main ridge cap line; the main (cathedral portion) ridge cap will be 2-3" higher than the dormer ridge cap.  Though a little bit noticeable, all of it is entirely secure and weatherproof, and I am brainstorming a weather vane to be located there in the future. Perhaps made of the leftover copper from the shower pan!




Some of the tools of the concealed fastener standing seam metal roofing trade.  Lots of delicate and gooey things to be worked with.



Here is a look at the dormer ridge cap (oops -- pictures in this post are not in chronological order!) during installation.  Again, we have the higher geometry thing going here....




And, voila!  The roof is finished!  Looks awesome and lovely with the stained cedar siding.  (Now if someone would only stain that ONE fascia board above the loft windows -- !)



Here is a look at the gable edge trim installed.  Exquisite lines.  I just want to HUG that roof!!  (I can hear Kyle solemnly reminding me that every edge of metal is as sharp as a razor, and the metal is awfully easily bent...)  And now on to the bow wall (soon), which has been on hold for quite a while as discussions take place about the design and construction of whatever manner of shed is being contemplated at the moment.  There have been many. 

Thursday, October 23, 2014

A Few Notes From the Tiny House





Here is another interim shot of the floor.  I haven't got a good picture of the finished combed stain.  The polyisocyanurate rigid foam insulation installation began about two minutes after the floor was dry, and got covered with little shreds of foam in no time.  A picture will be forthcoming when the polyurethane has gone on.




A gift from the garden on the hill, delivered by A, posed by me in the tiny house, as a hummingbird and a mole chatting around the stud. Delicious!




I took some shots of the loft windows to send to the screen-making shop in Loveland, so the proprietor could see where the little tabs were to go.  To the left of the center latch is the tiny slot which I was noting. 




It turns out that the little tabs were not used.  The first of three screens, a test, was ready in a day, and fit perfectly. Holes will be drilled for the little metal posts to slip into, a sturdier method of securing them after all.




In the midst of the gathering momentum, I paused to make a sign for us to hold up at the airport for my friend C, returning from Australia.  Her daughter E and granddaughter LL picked me up so we could meet the flight. What fun!

Saturday, September 27, 2014

Bad News, Good News, Lots of Other News


Last Friday I had a near catastrophe as I went to preview the most  recent post, prior to publishing it -- thought I had lost the whole many-pictured many-captioned post (the bad news)! But thanks to a little advice, and a little courage and ingenuity, and a lot of what can only be called luck (although some may prefer to call it the vast intricacies of Google software design), I rescued it.  I include this picture mostly to remind myself that the trick turned out to be clicking on the "close" link, which closed the little block.  Heaven help me if something different goes wrong the next time.



To those of you who have already tasted the heavenly Belgian Waffles made by former NKU professor Marty Meersman, this photo, in association with my tiny house, needs no caption.  For the sadly underpriveleged rest, this photo signals my success in scheduling Marty's Waffles Food Truck for an appearance at the tiny house clean-up and housewarming party near the end of next month (the good news!).  Yum!



The sight of the finished starboard siding is really deeply satisfying; having the entry door frame trimmed, and the whole wall sided somehow shifts the exterior work from being "in-progress" to "nearly complete" in  my mind.  Now it feels like we are almost ready to roll!  A vastly untrue, but still very uplifting thought. Again, it looks like a house from this side now; the doorway, even without its door, beckons entry, doesn't it?




M took me into her shop over the weekend and showed me the sheet of hammered copper with its rainbow of colors from annealing it, preparatory to cutting and forming it into the shower pan. Beautiful. 

 


Now we have the decision to make about the final surface color treatment, which could be left as is (as I am sure J in Baton Rouge would want) or treating it with liver of sulfate and giving it a lovely dark brown tone.  We have not attempted to explore the myriad of other possible patina options, and, for the sake of keeping it simple, probably won't.  Apparently after the color is achieved, a lacquer may be applied to preserve it, the only question for me being:  Might there be any issue with soap and water, and tender bare toes, coming in contact with the remnants of the creepy-sounding liver of sulfate over time?  I don't mind the thought of the copper aging and acquiring some additional organically patterned patina of its own.  




Things-an-inexperienced-metal-worker(me)-did-not-think-of-on-her-own:  #1) M devised a crimp for the corners of the shower pan which will have I believe the only soldered seams.  Not unsurprisingly, the corner joint needs to be stable in order to solder it, and having the two cut edges simply meet would not be stable. M had the forethought to solve this issue in the design stage, thereby leaving Kyle enough time to rout very shallow channels in the wooden frame to allow PERFECTION of fit for the finished pan into the frame.  Wow!




P's well-worn steel-toed boots dangle from the loft as we ponder and cogitate over what 12V wiring I will actually need. There is a constant balancing act between keeping it simple and the sensible idea of slight overkill at the stage of installing wiring into walls.  Now is obviously the time to painlessly add paths, devices, etc., for whatever need may be imagined to come up, in the near or distant future.  On the other hand, just how many light fixtures and outlets can possibly be needed in a 7' x 14' house that has 7 windows??  Assuming the continued existence of both candles and oil lamps, and that the sun also rises, just how much back up do I need? 




A nifty little kit with connectors will allow us to create a 12V outlet without needing separate wiring for a switch. The plan at the moment is to use five doubles and two singles of these, and only one hard-wired 12V device, for a vent fan.





The 100' spool of the Rolls Royce of 12V wire: waterproof, oil-resistant, double-insulated, 14-3, tinned copper, stranded marine cable.  Thank you R in South Norwalk for your advice, and L in Columbus for your promptness.  We (i.e., P) will be ready to (un)roll on Friday!





I happened to see this label on the inside of the exterior plywood sheathing. Good to know!  Minnie will surely have more confidence in this whole enterprise ...





On the topic of labels, this one was cleverly hidden on the edge of the lower sash of the one Marvin window on the house (a circa 1999 display unit), the evergreen-colored one from B's Bargains in California, KY.  With the help of two of Kyle's shims, I managed to tilt the sash outward and copy the information so T at Marsh Building Products in Ft. Thomas could order me a full screen for the window.  Amazingly (although 1999 seems to me to be a mere moment ago), I could order it in the original evergreen.  Thumbs up!





The floor finishing begins with my drawing pencil lines lengthwise on the plywood subfloor, about 3" apart.  Then in the distance may be seen a few test lines I stained with the exterior stain/sealer from the cedar siding, and to their right a few lines drawn with a wood stain marker. 




The wood stain marker won out, and I was able to draw ALMOST all the lines with one marker.  A good buy.


 

After drawing the stain lines I began sanding (see upper right patch) with medium grit sanding sponges, with the direction of the drawn lines, NOT with the grain of the plywood, which went side-to-side.  There were two purposes for the sanding: first, to clean up the dirty surface without wetting it, and second, to impart as many lengthwise striations as possible, to enhance the lengthwise hard wood floor effect.





Above may be seen the floor after directional sanding, as compared to the left-most strip here, that has not yet been sanded.




One 4' x 7' piece of flooring is prepped for staining.  But it is time for my wrists to take a break, so more anon.