Thursday, October 30, 2014

Polyiso(cyanurate) Post: B&B Insulation Installation





On the first day of installation of the polyisocyanurate rigid foam insulation, we were all reminding each other to make sure the roof membrane in the peak of the ceiling got sliced out (before the foam was installed!); otherwise all the meticulous attention to detail on Kyle's part for the roof venting system would be wasted. This was successfully accomplished in the loft peak, where the ridge cap had already been installed.  Ultimately Kyle sliced out the portion in the peak of the great room from up on the roof, as he was installing that final ridge cap.  This is B's helper, B, working up in the loft.



Here the polyiso blocks are being installed in the ceiling of the great room, the "cathedral ceiling".  It turned out that no adhesive was needed, because B&B were able to cut the foam precisely enough that it could be friction-fit really securely.  The two worst parts of the job were 1) the tiny fiberglass fibers which were mostly quite loosely attached to the dark facing paper, and brushed off easily onto clothing or skin ("the gift that keeps on giving," as B said), and 2) the peskiness of insulating around the electric boxes and wiring with spray foam, which comes in various expansion strengths (confusingly labeled), just to keep us guessing when we went to pick up supplies. Generally we wanted the spray foam with the smallest expansion rate, so as to more easily control the application around the wiring.



So the first day a lot was accomplished, by avoiding the spaces which had electrical boxes in them.  The Xs below the level of the future chair rail in this view are reminders not to insulate before the installation of the shower pan, due to the carpentry installation process. The oil-filled electric radiator in the foreground was needed on a few unseasonably cold and gusty days, and was powered by an extension cord (two actually) from inside Big D's basement studio.

 

Then came the little chunks to be pushed into the spaces between to joists of both loft spaces; then triangles and other geometrical configurations, here seen in the bow wall of the sleeping loft.




Lastly on the insulation (except for the shower pan wall spaces), B and M (a new helper, a recent college graduate in sculpture and new media), and ultimately Kyle, had the fun of spraying foam into crevices and around electrical boxes. Some of the foam tended to get a little out of control, which necessitated shaving it off. Or in some cases the spray foam began lifting out the block of polyiso, which later necessitated shaving that off.  The loan of an awesome flexible Japanese hand saw by B (who generously loaned a number of pieces of equipment and tools -- thanks so much!) made the insulation shaving go much more smoothly than it otherwise would have.  So other than tossing more fiberglass fibers into the air and into cracks and all over the floor (fiberglass makes Laurie cranky, can you tell?) the insulation installation was a huge success!



The source of some crankiness, in the interest of having a really toasty home in cold weather...



Somewhat tidier but not yet fiber-free!! Where is the shop-vac? This post has a cliff-hanger ending....!!!


Friday, October 24, 2014

Exterior 120V Outlets and Interior 12V Wiring




Kyle and electrician P converse about the construction portion of the installation of two exterior outlets on the house.  One will be at the stern, looking ahead to a possible use on a porch, and the other is for the entryway light just outside the door, on the starboard side.   It was decided to wire the entryway light connection as an outlet, and not hard wire the fixture.  It was thought prudent to plan to remove the light fixture before barreling down the highway (creating 60 mph hurricane force winds) without having to worry about it being sheared off by the force of the wind.  (Note Kyle's nifty styrofoam pads on the extension ladder in the background -- added in order to rest the ladder against the roofing without any nicks or scrapes or dings.  




Here Kyle is installing the wiring box by the door, having custom-made a nifty reversed cedar siding frame for it that will hold the screws for the receptacle and lid.  




And this is what the stern outlet looks like on the inside of the house, blocking having been added to secure the position of the box.  It is the blue box you can see behind the short 2x4.  The grey box is for an interior receptacle below the window seat.  Eventually this small area will be filled with spray foam.


 

The finished stern exterior outlet with its cover, a nice bronze instead of the usual white or grey. 




P rigged an instant roller for the 12V wire, with Big D's crowbar, Kyle's ladder, and a coat hanger from my trunk. It works perfectly.  She gets the two lengths of 14-3 tinned copper stranded marine cable up in the peak of the ceiling in no time.  


 

In mid-wire-pulling, I decide we need to re-route the 120V and the 12V cables to avoid the openings to the future cubby (the peak of the shed out on the tongue, which will be accessible from the loft, not the shed).  What you see is the re-routed cables going down the starboard gable line of the bow wall.  The cubby openings will be on either side of the two (tallest) center bays between the bow studs.  P generously humored my change, and it was done by the end of the hour.




A piece of nifty scaffolding equipment of B's (shaped when folded up a bit like the letter "W") creates this gangway going from one loft to the other, allowing P to tie up the 12V cable with the 120V pipe and prepare the junction box for the chandelier fixture.   




A view of the stern storage loft mid-wire-pulling.  Note the 12V and 120V systems are two completely separate systems, and there is no inverter involved.  The 12V will only be powered by the deep-cycle marine batteries and the 120V powered by household current from a friend's garage, or an RV hook-up.




Sketching for the positions of the marine 12V double receptacles. This is in the stern wall to starboard of the big window. The outlet will be accessible in the sidewall of the starboard bookcase in the windowseat nook. Probably for a USB charger! 




We almost had enough 12V cable on the 100 ft. spool from the marine store, but ended up buying about 20 feet from a big box building supply store.  It was stranded copper OS cable, 14-3, and worked fine.




Not to be forgotten at the tail end of the post is the taillight re-installation.  Kyle removed these after the first towing journey for their protection during the heavy exterior construction phase.  Now they will be replaced for good, ready for the next move!

The Roof Finale


Kyle is in the home stretch of the roofing installation here.  The ridge cap goes on last, after cutting the roof wrap that was over the venting, and installing the perforated venting strip, and the Z trim.  Lots of caulk and adhesive and rivets.  All the screws are concealed.  It turns out the dormer ridge cap line is lower than the main ridge cap line; the main (cathedral portion) ridge cap will be 2-3" higher than the dormer ridge cap.  Though a little bit noticeable, all of it is entirely secure and weatherproof, and I am brainstorming a weather vane to be located there in the future. Perhaps made of the leftover copper from the shower pan!




Some of the tools of the concealed fastener standing seam metal roofing trade.  Lots of delicate and gooey things to be worked with.



Here is a look at the dormer ridge cap (oops -- pictures in this post are not in chronological order!) during installation.  Again, we have the higher geometry thing going here....




And, voila!  The roof is finished!  Looks awesome and lovely with the stained cedar siding.  (Now if someone would only stain that ONE fascia board above the loft windows -- !)



Here is a look at the gable edge trim installed.  Exquisite lines.  I just want to HUG that roof!!  (I can hear Kyle solemnly reminding me that every edge of metal is as sharp as a razor, and the metal is awfully easily bent...)  And now on to the bow wall (soon), which has been on hold for quite a while as discussions take place about the design and construction of whatever manner of shed is being contemplated at the moment.  There have been many. 

Thursday, October 23, 2014

A Few Notes From the Tiny House





Here is another interim shot of the floor.  I haven't got a good picture of the finished combed stain.  The polyisocyanurate rigid foam insulation installation began about two minutes after the floor was dry, and got covered with little shreds of foam in no time.  A picture will be forthcoming when the polyurethane has gone on.




A gift from the garden on the hill, delivered by A, posed by me in the tiny house, as a hummingbird and a mole chatting around the stud. Delicious!




I took some shots of the loft windows to send to the screen-making shop in Loveland, so the proprietor could see where the little tabs were to go.  To the left of the center latch is the tiny slot which I was noting. 




It turns out that the little tabs were not used.  The first of three screens, a test, was ready in a day, and fit perfectly. Holes will be drilled for the little metal posts to slip into, a sturdier method of securing them after all.




In the midst of the gathering momentum, I paused to make a sign for us to hold up at the airport for my friend C, returning from Australia.  Her daughter E and granddaughter LL picked me up so we could meet the flight. What fun!

Saturday, September 27, 2014

Bad News, Good News, Lots of Other News


Last Friday I had a near catastrophe as I went to preview the most  recent post, prior to publishing it -- thought I had lost the whole many-pictured many-captioned post (the bad news)! But thanks to a little advice, and a little courage and ingenuity, and a lot of what can only be called luck (although some may prefer to call it the vast intricacies of Google software design), I rescued it.  I include this picture mostly to remind myself that the trick turned out to be clicking on the "close" link, which closed the little block.  Heaven help me if something different goes wrong the next time.



To those of you who have already tasted the heavenly Belgian Waffles made by former NKU professor Marty Meersman, this photo, in association with my tiny house, needs no caption.  For the sadly underpriveleged rest, this photo signals my success in scheduling Marty's Waffles Food Truck for an appearance at the tiny house clean-up and housewarming party near the end of next month (the good news!).  Yum!



The sight of the finished starboard siding is really deeply satisfying; having the entry door frame trimmed, and the whole wall sided somehow shifts the exterior work from being "in-progress" to "nearly complete" in  my mind.  Now it feels like we are almost ready to roll!  A vastly untrue, but still very uplifting thought. Again, it looks like a house from this side now; the doorway, even without its door, beckons entry, doesn't it?




M took me into her shop over the weekend and showed me the sheet of hammered copper with its rainbow of colors from annealing it, preparatory to cutting and forming it into the shower pan. Beautiful. 

 


Now we have the decision to make about the final surface color treatment, which could be left as is (as I am sure J in Baton Rouge would want) or treating it with liver of sulfate and giving it a lovely dark brown tone.  We have not attempted to explore the myriad of other possible patina options, and, for the sake of keeping it simple, probably won't.  Apparently after the color is achieved, a lacquer may be applied to preserve it, the only question for me being:  Might there be any issue with soap and water, and tender bare toes, coming in contact with the remnants of the creepy-sounding liver of sulfate over time?  I don't mind the thought of the copper aging and acquiring some additional organically patterned patina of its own.  




Things-an-inexperienced-metal-worker(me)-did-not-think-of-on-her-own:  #1) M devised a crimp for the corners of the shower pan which will have I believe the only soldered seams.  Not unsurprisingly, the corner joint needs to be stable in order to solder it, and having the two cut edges simply meet would not be stable. M had the forethought to solve this issue in the design stage, thereby leaving Kyle enough time to rout very shallow channels in the wooden frame to allow PERFECTION of fit for the finished pan into the frame.  Wow!




P's well-worn steel-toed boots dangle from the loft as we ponder and cogitate over what 12V wiring I will actually need. There is a constant balancing act between keeping it simple and the sensible idea of slight overkill at the stage of installing wiring into walls.  Now is obviously the time to painlessly add paths, devices, etc., for whatever need may be imagined to come up, in the near or distant future.  On the other hand, just how many light fixtures and outlets can possibly be needed in a 7' x 14' house that has 7 windows??  Assuming the continued existence of both candles and oil lamps, and that the sun also rises, just how much back up do I need? 




A nifty little kit with connectors will allow us to create a 12V outlet without needing separate wiring for a switch. The plan at the moment is to use five doubles and two singles of these, and only one hard-wired 12V device, for a vent fan.





The 100' spool of the Rolls Royce of 12V wire: waterproof, oil-resistant, double-insulated, 14-3, tinned copper, stranded marine cable.  Thank you R in South Norwalk for your advice, and L in Columbus for your promptness.  We (i.e., P) will be ready to (un)roll on Friday!





I happened to see this label on the inside of the exterior plywood sheathing. Good to know!  Minnie will surely have more confidence in this whole enterprise ...





On the topic of labels, this one was cleverly hidden on the edge of the lower sash of the one Marvin window on the house (a circa 1999 display unit), the evergreen-colored one from B's Bargains in California, KY.  With the help of two of Kyle's shims, I managed to tilt the sash outward and copy the information so T at Marsh Building Products in Ft. Thomas could order me a full screen for the window.  Amazingly (although 1999 seems to me to be a mere moment ago), I could order it in the original evergreen.  Thumbs up!





The floor finishing begins with my drawing pencil lines lengthwise on the plywood subfloor, about 3" apart.  Then in the distance may be seen a few test lines I stained with the exterior stain/sealer from the cedar siding, and to their right a few lines drawn with a wood stain marker. 




The wood stain marker won out, and I was able to draw ALMOST all the lines with one marker.  A good buy.


 

After drawing the stain lines I began sanding (see upper right patch) with medium grit sanding sponges, with the direction of the drawn lines, NOT with the grain of the plywood, which went side-to-side.  There were two purposes for the sanding: first, to clean up the dirty surface without wetting it, and second, to impart as many lengthwise striations as possible, to enhance the lengthwise hard wood floor effect.





Above may be seen the floor after directional sanding, as compared to the left-most strip here, that has not yet been sanded.




One 4' x 7' piece of flooring is prepped for staining.  But it is time for my wrists to take a break, so more anon.

Sunday, September 21, 2014

Juggling Pencils, Power, Plans, Peen hammers, Pickles, Pottery and Precious Passengers


Since this picture was taken, the starboard side of the tiny house has probably gotten the rest of its siding installed. Kyle has been working over there yesterday and today.  The door has its trim on, and the forest green window looks quite handsome.  I have decided not to install the last window -- it would be squeezed in just to the right of the door.  It is white, and I think the house will just look better without it.  There will be plenty of light from all the other windows. 


As the bow wall siding installation (and the construction of the shed to house batteries and propane tanks) is contemplated, an inventory of the remaining long siding pieces suggests we will not have enough siding to do that final wall (sigh...more staining!!).  But for the moment, we have collected all the shorter pieces, and may squeak by, since the shed side walls will be set in about a foot from the outside of the corner trim on the house, necessitating about 42 very short (perhaps 9") cedar siding lengths. Similarly, the roof of the shed will run about a foot inside the roof line of the house proper, but since the ends of each of those siding pieces will be mitered, they will have to be more like 20" pieces. The rest of the shed could be built and trimmed differently.


Here is an optimistic view of the house floor (otherwise known as the sub-floor). At the time of the picture, it was very clean, having been swept immediately prior by yours truly. The optimism comes from the hope that I can get the floor painted and sealed before any more construction or visitor debris can settle in.  Even as I write this, though, there is a plan to work on some of the wiring tomorrow, which is a higher priority.  We shall see.


Soon after my last post, Kyle's wife M and I decided to go ahead with the design and construction of a hammered copper shower pan, since I couldn't find an inexpensive 30" x 30" shower pan.  Instead of spending several hundreds of dollars on a pan that would have to be modified anyway, I finally allowed myself to imagine M making me one!!  Hours (or moments) after Kyle brought home the 4' x 10' sheet of 16oz copper, Junior, the youngest member of the household, innocently joined our discussion and amiably reclined on one end of it.  Who knows, maybe it was cool to the touch, or maybe he really has sophisticated taste in lawn furniture.  The phrase "to the manner born" came to mind, although none of Junior's other pastimes, including chewing rocks as big as his head, call that particular phrase to mind.


Hearing that Junior got into the picture, Tuck made sure to give me a happy smile from his (Junior-proof) perch in the house, just to ensure he got his 15 seconds of fame.


And Shelby, looking the picture of disheveled contentment, grinned too, from her position on the walk.


Okay, here is a view of the first step toward the frame for the shower pan. In home-decoration-ese, this is known as a neo-angle corner shower pan. Designed by M and I and Kyle, and produced in the open air shop of their barn by Kyle.


Isn't this gorgeous?  I contributed about 53 dimples to this copper landscape of gently rolling hills, M did the rest.  It is REALLY fun to bang on the copper sheet (cut to 4' x 4' -- by me, incidentally).  But my hammering muscles were long out of shape, so I had to leave it to the blacksmith to sculpt.  What a beautiful job, too!  It looks simply luscious. 


Here is a view of the final framework Kyle constructed to support the copper.  It took much mulling over on all of our parts to design it in such a way that it can be installed into the house, and also be entered by a shower-taker, and also gotten underneath in case of leaky drain pipes and such (there will be a chase).


M test-soldered a corner joint, possibly to be sure she was happy with the pattern she was making for the copper sheet.


And here she shows that she is in the running as an expert origami paper-folding practitioner.  Again, impressive!


In this view, one of the trailer lights (still with its temporary jury-rigging from the move) leans against a tire of Kyle's truck, a mnemonic device to remind him to take it off the 2x4, and me to bring it with me to Columbus to the marine electric store the next day.  I was to look for possible replacements, with a lower profile, and possibly LED lights instead of incandescent. (I did bring it, but what with getting carried away by the 12V wiring, deep cycle marine batteries, fuse blocks, and cigarette-lighter-type receptacles, I didn't look very hard -- and didn't see much -- maybe there is more choice in an auto parts store.  But more on that topic in the next post!)


This little pipsqueak, LL, came for a visit, and happily found the house interesting.  I like having the kids pass through every once in a while, because, not only do they like giving me ideas, but it reminds me that I really want to keep the house kid- and mess-friendly as I put together the interior furniture and decor.  I don't want to have to keep on saying no, and don't want to spend a lot of time protecting things from curious or less-than-impeccably-clean hands.


Bless my friends C & H for coming by, and relieving me of the queen-sized futon mattress that has sat on this frame as my couch for probably 20 years!  Now I can work on cutting down the backrest portion to make it into the built-in windowseat/bed for the stern end.


I made three drawings to plan the construction of the shed that will be built on the trailer tongue. This one shows (in red) the outline of the shed relative to the bow wall. It's a view looking at the bow wall from the front. The shed will be about 5' wide and 16" deep.  I guess the height will work out to be approximately 10', since the trailer floor is about two feet from ground level, and when last measured (before the ridge vent cap!) the whole thing was 13' 4" from the ground. 


In this view, I sketched in the batteries and propane tanks where I hope to place them, the propane in a metal-lined box, and the batteries as far as possible from the propane tanks and connections as possible. If I am lucky, I will have room between to stand my collapsed six foot long EZ-Up booth tent (just slightly less square footage than the house itself). The batteries are about 72 lbs. each, and the full propane tanks are about 36 lbs. each.  So the batteries are going on the starboard side, to offset the greater weight of the kitchen on the port side.


I wanted to get a feel for what kind of doors I would need on the shed, and this sketch shows a bottom door/cover which will lift up to expose the batteries and propane tanks.  I will need to be able to get the propane tanks out as easily as I can in order to exchange them.  I tried to leave room on the inside to allow two milk crates to fit (with their respective tanks).  I read online somewhere that keeping the tanks in milk crates is a fairly easy way to keep them upright in transit.   The two upper doors will open out on hinges on either side. 


Too much graph paper is not good for the soul -- so I took to making some crayon encaustic prints while in Columbus helping out a friend after surgery.  Must keep the artistic fires burning after all!  I want to have something to trade or sell in my traveling peddlar life...



Additionally, nobody can have too many pickles in his or her pantry (especially as a way to preserve vegetables a bit), so I was happy to experiment with C and B in Loveland a couple of times making the most delicious refrigerator pickles. Pickled beets and carrots are tastier than beets and onions, and cauliflower is yummy, though raw Brussels sprouts not so much. Zucchini and cucumbers are wonderful.  I am about ready to make a third batch -- I am almost out!


In response to a 2012 (!) call to artists, I was chosen to be in a very interesting exhibition in Covington which opened a few weeks ago, of artwork made specifically in response to life's biggest challenges: grief, loss, PTSD, mental and physical disabilities and illness, etc.  Intermixed with all the myriad of details with my tiny house, I managed to successfully deliver my artwork on time (and even respond to interview questions of a local arts reviewer)!  My entry was the work "47 Goodbyes: A Tribute to My Father's Life and Death", a series of stained and glazed miniature porcelain vessels capturing my memories of my father, including his final illness.  The opening reception was very successful, and more personal than most. 


On a domestic note, Minnie, the frustrated girl warrior, who has not been let roam all summer, has been doing a very good job keeping the insect population down in my apartment.  Here she is fixated on a small shadow, which turned out to be a shield bug on the OUTSIDE of the screen.


But HERE she has found a bumbling (and very much alive) cicada, either out on the porch or after it got inside somehow.  She/he provided only one evening's entertainment before keeling permanently over, but Minnie avidly interacted with her/him for several hours. Thankfully, though, she did not eat the poor critter as she has the moths and scutilaria she comes across -- I wouldn't want to listen...